As construction technology developed and new building materials (metal, reinforced concrete) appeared, framed structures evolved. Frame construction made it possible to depart from traditional designs and to formulate efficient layouts to meet the requirements of production technology.
Type of Building: Industrial
Height of Building: 8 Storied
Total Construction Area: 8, 64,000 Sft. (1,08,000 Sft per floor)
Duration of Construction: 10 Months