MAF FOOT WEAR LIMITED

A good factory building strives to perform different operations more efficiently, reducing the material handling cost. A proper building set up can reduce stoppages and interruptions maximising the production.

INDUSTRIAL PROJECT BY P2P

  • Type of the building:Industry

  • Height of building: 08 Stories

  • Total construction area: 5,40,000 Sft (60,000 Sft each floor)

  • Duration of construction:10Months